PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing bathroom carriers at the 4th floor Facing North.jpg Installing handrails at Stair -3 Facing West.jpg Installing waste and vent piping at the 1st floor Facing North.jpg Laying out block at the 1st floor Sally ports Facing West.jpg Started exteriot Framing at the 1st floor South Elevation.jpg Fans for the high roof Facing South.jpg
Previous pageNext page Started exteriot Framing at the 1st floor South Elevation
Started exteriot Framing at the 1st floor South Elevation